- Expertini Resume Scoring: Our Semantic Matching Algorithm evaluates your CV/Résumé before you apply for this job role: Sr. Construction Manager, MLZ Data Center Construction.
Urgent! Sr. Construction Manager, MLZ Data Center Construction Job Opening In South Bend – Now Hiring Amazon
Description
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure.
In other words, we’re the people who keep the cloud running.
We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on.
We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles.
You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers.
And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM)], you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers.
Our data centers are industry-leading examples of energy efficient and cost-effective designs.
You will:
• Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
• Own construction project management and oversight of construction related activities.
• Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
• Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
• Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding, execution, and final hand-off to our customers.
We develop innovative data centers for our Customers.
Key job responsibilities
• Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
• Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and close out phases.
• Create construction project scope and request for proposals.
• Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
• Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
• Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
• Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
• Support commissioning and integrated system testing and oversight.
• Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
• Support capital request creation.
• Analyze and report construction progress and financials.
• Record and report key construction metrics to team members and management.
• Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
• Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
A day in the life
This project site is in New Carlisle, Indiana.
About the team
Diverse Experiences
Amazon values diverse experiences.
Even if you do not meet all the preferred qualifications and skills listed in the job description, we encourage candidates to apply.
If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform.
We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony.
Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture.
When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious.
Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences.
Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer.
That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic Qualifications
• Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Construction Management, or an equivalent engineering science plus 5+ years of relevant construction experience, OR 9+ years of relevant construction experience in lieu of a degree.
• 4+ years of experience in construction management of large, complex projects involving large-scale mechanical, electrical, and plumbing (MEP) plants.
• 4+ years of general contractor and vendor management experience (request for proposals, bidding, change orders, quality control, and RFI and submittal tracking) associated with construction and project execution.
Preferred Qualifications
• MS in Construction Management or Engineering (Mechanical, Electrical, Civil, Structural)
• 7+ Yrs.
Exp in Construction Management of large-scale projects.
7+ Yrs.
Exp.
Project Management and Vendor Management
• 3+ Yrs.
Exp.
In Data Center system-level architecture and electrical engineering principles.
3+ Yrs.
Exp.
In Data Center system-level architecture and mechanical engineering principles
• Experience designing data centers or critical MEP infrastructure
• Certified as a Professional Engineer (PE), LEED, or Certified Construction Manager (CCM)
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers.
If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information.
If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
Our compensation reflects the cost of labor across several US geographic markets.
The base pay for this position ranges from $125,400/year in our lowest geographic market up to $239,300/year in our highest geographic market.
Pay is based on a number of factors including market location and may vary depending on job-related knowledge, skills, and experience.
Amazon is a total compensation company.
Dependent on the position offered, equity, sign-on payments, and other forms of compensation may be provided as part of a total compensation package, in addition to a full range of medical, financial, and/or other benefits.
For more information, please visit https://www.aboutamazon.com/workplace/employee-benefits .
This position will remain posted until filled.
Applicants should apply via our internal or external career site.
✨ Smart • Intelligent • Private • Secure
Practice for Any Interview Q&A (AI Enabled)
Predict interview Q&A (AI Supported)
Mock interview trainer (AI Supported)
Ace behavioral interviews (AI Powered)
Record interview questions (Confidential)
Master your interviews
Track your answers (Confidential)
Schedule your applications (Confidential)
Create perfect cover letters (AI Supported)
Analyze your resume (NLP Supported)
ATS compatibility check (AI Supported)
Optimize your applications (AI Supported)
O*NET Supported
O*NET Supported
O*NET Supported
O*NET Supported
O*NET Supported
European Union Recommended
Institution Recommended
Institution Recommended
Researcher Recommended
IT Savvy Recommended
Trades Recommended
O*NET Supported
Artist Recommended
Researchers Recommended
Create your account
Access your account
Create your professional profile
Preview your profile
Your saved opportunities
Reviews you've given
Companies you follow
Discover employers
O*NET Supported
Common questions answered
Help for job seekers
How matching works
Customized job suggestions
Fast application process
Manage alert settings
Understanding alerts
How we match resumes
Professional branding guide
Increase your visibility
Get verified status
Learn about our AI
How ATS ranks you
AI-powered matching
Join thousands of professionals who've advanced their careers with our platform
Unlock Your Sr Construction Potential: Insight & Career Growth Guide
Real-time Sr Construction Jobs Trends in South Bend, United States (Graphical Representation)
Explore profound insights with Expertini's real-time, in-depth analysis, showcased through the graph below. This graph displays the job market trends for Sr Construction in South Bend, United States using a bar chart to represent the number of jobs available and a trend line to illustrate the trend over time. Specifically, the graph shows 71375 jobs in United States and 198 jobs in South Bend. This comprehensive analysis highlights market share and opportunities for professionals in Sr Construction roles. These dynamic trends provide a better understanding of the job market landscape in these regions.
Great news! Amazon is currently hiring and seeking a Sr. Construction Manager, MLZ Data Center Construction to join their team. Feel free to download the job details.
Wait no longer! Are you also interested in exploring similar jobs? Search now: Sr. Construction Manager, MLZ Data Center Construction Jobs South Bend.
An organization's rules and standards set how people should be treated in the office and how different situations should be handled. The work culture at Amazon adheres to the cultural norms as outlined by Expertini.
The fundamental ethical values are:The average salary range for a Sr. Construction Manager, MLZ Data Center Construction Jobs United States varies, but the pay scale is rated "Standard" in South Bend. Salary levels may vary depending on your industry, experience, and skills. It's essential to research and negotiate effectively. We advise reading the full job specification before proceeding with the application to understand the salary package.
Key qualifications for Sr. Construction Manager, MLZ Data Center Construction typically include Other General and a list of qualifications and expertise as mentioned in the job specification. Be sure to check the specific job listing for detailed requirements and qualifications.
To improve your chances of getting hired for Sr. Construction Manager, MLZ Data Center Construction, consider enhancing your skills. Check your CV/Résumé Score with our free Resume Scoring Tool. We have an in-built Resume Scoring tool that gives you the matching score for each job based on your CV/Résumé once it is uploaded. This can help you align your CV/Résumé according to the job requirements and enhance your skills if needed.
Here are some tips to help you prepare for and ace your job interview:
Before the Interview:To prepare for your Sr. Construction Manager, MLZ Data Center Construction interview at Amazon, research the company, understand the job requirements, and practice common interview questions.
Highlight your leadership skills, achievements, and strategic thinking abilities. Be prepared to discuss your experience with HR, including your approach to meeting targets as a team player. Additionally, review the Amazon's products or services and be prepared to discuss how you can contribute to their success.
By following these tips, you can increase your chances of making a positive impression and landing the job!
Setting up job alerts for Sr. Construction Manager, MLZ Data Center Construction is easy with United States Jobs Expertini. Simply visit our job alerts page here, enter your preferred job title and location, and choose how often you want to receive notifications. You'll get the latest job openings sent directly to your email for FREE!